Precautions for water well drilling rigs during transportation and maintenance

During transportation, assembly, disassembly and maintenance of the water well drilling rig, safety norms should be strictly observed to prevent malfunctioning of.


Precautions for water well drilling rigs during transportation


When the water well drilling rig is being transported, it is necessary to keep the centre of gravity in balance according to the road conditions and the site; the construction site is forbidden to drill at will; the backfilled pits should be well marked; the narrow road or dangerous road section should be walked with the mast down and contracted; the inclined road section should be adjusted with the mast up and down, tilted left and right, and the rig's centre of gravity should be adjusted by getting on board and turning; when the road or the construction site is waterlogged, the rig can be guided by the drill bit.

Precautions when repairing water well drilling rigs


When repairing the water well drilling rig, it needs to be cooled down before doing it, so as not to cause burns to the personnel due to high temperature; the hydraulic system of the rig needs to be relieved of pressure after repair, so as to avoid the danger caused by the internal storage of high pressure; when dismantling the main volume braking system of the rig, it is strictly forbidden to repair the main volume with load; when dismantling the right twist non-rotating wire rope connected to the lifting device, attention should be paid to the rotating injury of the machinery; when the lifting device of the rig is not flexible in rotation, resulting in the live wire rope with rotating force to twist the rope, personnel should be avoided to be pinched.

Product Catalog