How to maintain the water well drilling rig?
Water well drilling rig is our company's drilling equipment for complex strata such as soil, rock, pebble gravel layer, colluvial pebble gravel layer, etc. It is widely used in water conservancy construction, farmland projects and other foundation drilling equipment. No matter what equipment is used, it needs to be paid attention to when it is used in order to improve the production efficiency and prolong the service life, the following professional and technical personnel from Relied Group will explain how to do the maintenance and repair work of the water well drilling rig:

1. always pay attention to check the water and gas pipeline, whether the bolts and nuts of each accessory of the drilling rig are firm.

2. Check the lubricating oil condition of the wind motor at all times.

3. When the working surface is submerged in water, open the hole with a large diameter drill bit and insert the drill pipe so that the drill pipe is exposed to the water surface for 1-2 meters to prevent mud and rock slag from falling into the hole.

4. Do not allow the drill rig to reverse at noon during drilling operation to avoid the drill pipe falling into the hole.

5. When the drilling rig stops working for a short period of time, a small amount of pressure should be given to prevent mud and sand from intruding into the interior of the rig's impactor. If the rig stops working for a long time, the impactor should be lifted 1-2 meters from the bottom of the hole for fixing.

6. Pay attention to the sound of the impactor and the operation of the gearbox when working, and stop the rig immediately if you find any abnormal sound or phenomenon, and check it in time.

7. When adding new drill pipes, pay attention to keep the drill hole clean to avoid mud and sand from mixing inside the drill impactor and damaging the drill rig parts.

8. At the end of each work shift, clean up the dirt on the surface of the drilling rig in time, except for normal handling, it is strictly forbidden to dismantle and unload the rig at the working surface.

9. Use grease to lubricate the drill pipe joint and reducer of the drilling rig.

10. Wipe the outer surface of the rig clean, and pay attention to the clean and well-lubricated surfaces of the rig base chute, vertical shaft, etc.

11. Require lubrication oil or grease.

12. Check the oil level position of gearbox, distributor box and hydraulic system oil tank.

13. Remove the chuck, clean the chuck and chuck seat. If there is damage, replace them in time.

14. Clean the filter in the oil tank and replace the deteriorated or dirty hydraulic oil.

15. Check the integrity of the main parts and replace them in time if they are damaged, do not work with injuries.

16. If the drilling rig is not used for a long time, the exposed parts (especially the processing surface) should be lubricated with grease.